During drilling, cement grout is fed through an inner opening, with defined water/cement proportion, and under defined pressure. Pre-injection facilitates installation of a micro-pile at required depth and stabilises walls of the opening. Upon drilling to a required depth, a final injection with cement grout with defined water/cement proportion is then performed.
Applied systems enable simultaneous drilling without protection piping, injection, and reinforcement installation, which significantly affects efficiency of works and reduces mobilisation costs.
To obtain more information on services provided by DABI, contact our Production & Preparation Department.